Dell Managed PDU LED Manual do Utilizador Página 105

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 244
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 104
USER’S GUIDE
Managed Rack PDU
100
System requirements for outlet groups
To set up and use synchronized outlet control groups:
You need a 10/100Base-T TCP/IP network, with an Ethernet hub or switch that has a
power source not shared by the computers or other devices being synchronized.
If outlet groups are to be synchronized across multiple Rack PDUs, those Rack
PDUs must meet the following requirements:
They must be on the same subnet.
They must use firmware that has the same version number for both the Operating
System (AOS) module and the application module.
You need a computer that can initiate synchronized control operations through the
Web interface or command line interface of the Rack PDUs or through SNMP.
Outlet groups you synchronize must have the same Multicast IP address. Make sure
each Ethernet switch that connects Rack PDUs allows Multicast network traffic for
that Multicast IP address.
Vista de página 104
1 2 ... 100 101 102 103 104 105 106 107 108 109 110 ... 243 244

Comentários a estes Manuais

Sem comentários