
USER’S GUIDE
Managed Rack PDU
97
Configuring the Name and Location of the Rack
PDU
Path: Device Manager > Load Management > Device Load
The name and location you enter appear on the Home tab.
1. Click the Device Manager tab, then device load from the Load Management
menu.
2. Enter a name and location.
3. Click Apply.
Setting the Coldstart Delay
Path: Device Manager > Device Load
The Coldstart Delay is the number of seconds added to each outlet’s Power On Delay
before the outlet will turn on after power is applied to the Rack PDU. Allowed values are
from 1 to 300 seconds, Immediate, or Never (never turn on).
1. Click the Device Manager tab, then device load from the Load Management
menu.
2. Make a selection for Coldstart Delay.
3. Click Apply.
You can set the Name and Location through either the Device
Manager tab or the Administration tab. A change in one affects the
other.
Comentários a estes Manuais