Dell PowerVault 50F (Fibre Channel Switch) Manual do Utilizador Página 24

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 98
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 23
1-8 Rack Installation Guide
+,!
1. From the back of the rack, pull the switch out about 7 centimeters (cm) (about
3 inches).
The switch should lock in place.
2. Attach the end of the cable-management arm to the inner-slide rail by inserting the
two tabs into the two slots until the retaining clip snaps into place (see Figure 1-7).
-'$$)$.
Velcro strips
cable-management arm
tabs
slots
retaining clip
thumbscrew
inner-slide rail
safety release
latch
4939tbk1.book Page 8 Friday, October 8, 1999 1:22 PM
Vista de página 23
1 2 ... 19 20 21 22 23 24 25 26 27 28 29 ... 97 98

Comentários a estes Manuais

Sem comentários