Dell Networking S6000 Guia de Início Rápido Página 24

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 37
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 23
20 Installation
Figure 4-4. Four-Post Threaded Configuration
Installing the Switch
You can mount the switch in the 1U front-rack or 1U two-post (flush and center)
configurations. The following is an example of a 1U front-rack configuration.
For the 1U two-post (flush and center) configurations, slide the switch into the
rails in the same manner as the four-post configurations.
1U Front-Rack Installation
Configure the rails that are attached to the switch.
1
Attach the switch rails (inner chassis members) to the S6000 switch.
Figure 4-5, item 3 shows the detail for the front standoff with the locking tab.
Vista de página 23
1 2 ... 19 20 21 22 23 24 25 26 27 28 29 ... 36 37

Comentários a estes Manuais

Sem comentários